![]() Floor = mats>2x4>mats>5/8OSB>mats>11/16 plywood. |
![]() Materials for the back wall. One of many trips to Lowes. |
![]() Back wall in place. |
![]() Borrowed miter saw. Damn we're cheap. |
![]() Wall = 2x6 base w/staggered 2x4 beams and 5/8 drywall. |
![]() Back wall with mats installed. |
![]() Close up of mats in wall. |
![]() Mats are woven between staggered studs. |
![]() Better view of mat installation |
![]() Another view of mat installation. |
![]() Jeff and Jeremy assembling the right side wall. |
![]() Graffiti by Richard. |
![]() Art by Jeremy. |
![]() Poetry by Jeff. |