Left wall with top braces in.


Left part of front wall.


Final wall materials: pvc, glass, and wood.


Final wall is up.


View from inside room.


Live room door ready to be installed.


Door is in, drywall is going up.


Another shot of the door.


Drywall around window being installed.


Jeff(left) and Jeremy(right) installing drywall.


Almost ready for mud.


View from inside the room with drywall.


Filler to bring the door jam level with the room's floor.


Glass and carpet. Carpet was a freebie.