![]() Left wall with top braces in. |
![]() Left part of front wall. |
![]() Final wall materials: pvc, glass, and wood. |
![]() Final wall is up. |
![]() View from inside room. |
![]() Live room door ready to be installed. |
![]() Door is in, drywall is going up. |
![]() Another shot of the door. |
![]() Drywall around window being installed. |
![]() Jeff(left) and Jeremy(right) installing drywall. |
![]() Almost ready for mud. |
![]() View from inside the room with drywall. |
![]() Filler to bring the door jam level with the room's floor. |
![]() Glass and carpet. Carpet was a freebie. |