Jeremy did most of the finishing work in this room himself. He added texture to the ceiling to match the live room. Big thanks to Anna for helping with the prime and paint. Jeremy and his father filled the hole left by the chimney with some quikrete. Jeremy and Raz built the cabinet to add a little storage to the room and to cover the old bricks. We still plan on replacing the side door, but haven't got to it yet. Once the room started coming together, it didn't take long to finish. |
Primer going on. |
The window was cut out after painting. |
We filled the hole from the chimney with quikrete. |
The old closet used to cover these bricks. |
Here is the finished cabinet. |
Another shot of the cabinet. |
Back wall with light switch, cabinet, and trim. |
Ceiling, painting, and trim all done. |
We intend to replace the side door. |
Glass installed and desk test fitted in the room. |